Stone calculator

Let's figure out how much stone you need. First, pick your project's general shape:

My project is a:

Next, enter the length, width, and estimated depth of area you're covering and filling with stone.

Project Estimate:
Please note that this is an estimate and different surfaces require different quantities of stone

Send us your project details

Submit your project info to one of our stone experts and we'll get in touch to discuss timeline, price, and material choice within a business day.

Preston Lake Senior Living

Our Projects

At Frazier, we believe our projects speak for themselves. Check out some of the projects below to see how our stone seamlessly integrates into projects big and small.

Preston Lake Senior Living
Copper Beach Bank Stabilization

Our Projects

At Frazier, we believe our projects speak for themselves. Check out some of the projects below to see how our stone seamlessly integrates into projects big and small.

Copper Beach Bank Stabilization
Dominion Laydown Yard

Our Projects

At Frazier, we believe our projects speak for themselves. Check out some of the projects below to see how our stone seamlessly integrates into projects big and small.

Dominion Laydown Yard
Smith Creek Bridge

Our Projects

At Frazier, we believe our projects speak for themselves. Check out some of the projects below to see how our stone seamlessly integrates into projects big and small.

Smith Creek Bridge
North End Greenway

Our Projects

At Frazier, we believe our projects speak for themselves. Check out some of the projects below to see how our stone seamlessly integrates into projects big and small.

North End Greenway

Our Projects

At Frazier, we believe our projects speak for themselves. Check out some of the projects below to see how our stone seamlessly integrates into projects big and small.

Preston Lake Senior Living

Preston Lake Senior Living

Preston Lake Senior Living, also called The Retreat at Preston Lake.  This is a Senior Living facility located off of Stone Spring Road near the Preston Lake subdivision in Harrisonburg, VA.  The primary products being used on this project are RDC8 and RDC being used...

read more
Overlook Farms Produce Stand

Overlook Farms Produce Stand

Overlook Farms Produce Stand is located at the western side of the I-81 intersection of Friedens Church Road, or Exit 240 in Mt. Crawford, VA.  The customer required two different RDC products on this site primarily for building the roads leading into the produce...

read more
Copper Beach Bank Stabilization

Copper Beach Bank Stabilization

The purpose of this project is to stabilize existing retaining walls and to reinforce slopes bordering the Copper Beach Student Housing development near James Madison University in Harrisonburg.  The primary products being used on this project will be/are RDC8 &...

read more
Dominion Laydown Yard

Dominion Laydown Yard

J.R. Caskey (from Oilville, VA) did the project.  It is a 10-acre laydown yard which will be used to store materials and equipment for Phase 3 of a project for Dominion Energy. The laydown yard consists of a 12-inch layer of compacted 21As. Dominion Energy is...

read more
Smith Creek Bridge

Smith Creek Bridge

National Bridge Builders (from Kernersville, NC) replaced a single-lane, low-water bridge on Route 620 (Smith Creek Rd) in Shenandoah County.  The old bridge was built in 1932.  The new bridge is two-lanes and was positioned slightly upstream from the old bridge to...

read more
Dunkin

Dunkin

A new construction needs to be able to catch the eye of the passer-by. Frazier Quarry was able to help with the new construction of Dunkin Donuts. We worked with the Contractor from the start of the construction with construction aggregate and finished it...

read more
North End Greenway

North End Greenway

By connecting a section on the north end of Harrisonburg to the rest of the bike Friendly City, we have added a 2.5 mile long thread to Harrisonburg’s bike and pedestrian friendly fabric. This allows citizens to commute in a safe and fun way. The Frazier Quarry...

read more
Crowe Drive

Crowe Drive

In an effort to expand access to a portion of Rockingham County’s Industrial Park, VDOT rerouted and improved the existing Crowe Drive to increase access to a newly constructed cold storage facility as well as potential acres valuable to the County’s...

read more
Rockingham County Landfill

Rockingham County Landfill

In 2017 the Frazier Quarry worked closely with Rockingham County and A&J Development and Excavating to keep the construction of the Rockingham County Landfill’s new cell on time. With rain delaying the ability to screen out the native soils to a specific size...

read more

Subscribe To Our Newsletter

Join our mailing list to receive the latest news and updates from our team.

Thank you for Subscribing!